Nonresidential building spending is forecast to rise 3.0% in 2027, according to the AIA July 2026 Consensus Construction Forecast. That is an upgrade from the 2.2% the same panel projected in January 2026. The panel includes AIA, Dodge Construction Network, Moody’s Analytics, FMI, ConstructConnect, Associated Builders and Contractors (ABC) and others.
The recovery starts from a weak base. Nonresidential building spending fell 2% to $846 billion in 2025, and it was down 7% in the first five months of 2026 compared with a year earlier. Panelists cut their 2026 call from a 1.0% gain to a 0.3% decline, so the rebound has been delayed rather than cancelled.
The economic backdrop
AIA points to three forces shaping 2027:
- Cyclical pressure: High interest rates and sticky inflation are cooling demand and tightening project financing.
- Structural shifts: An aging population is lifting health care demand, while lower immigration is shrinking the labor pool.
- Policy: Tariffs, immigration enforcement and geopolitical risk, including the oil price spike tied to the Iran conflict, are clouding budgets.
What leading indicators say
Forward-looking signals are mixed. The AIA/Deltek Architecture Billings Index, which leads nonresidential construction by about 9 to 12 months, has been declining since early 2023. That suggests design work feeding 2027 starts is still soft outside a few sectors.
Contractor backlogs tell the same split story. ABC’s Construction Backlog Indicator fell to 8.1 months in October 2026. Contractors without data center work saw backlog drop to 7.6 months, while those building data centers held about 11.5 months of work.
Which construction sectors will grow in 2027?
Data centers, hotels and health care facilities are the strongest construction sectors heading into 2027, while traditional offices and manufacturing plants are expected to keep shrinking. The table below summarizes the AIA panel’s 2027 forecasts by building type.
| Sector | 2027 spending forecast (%) | Outlook | Main driver |
|---|---|---|---|
| Data centers | +25.0 | Strong growth | AI and cloud computing investment |
| Hotels | +5.2 | Growing | Facility upgrades to compete for travelers |
| Health care | +4.4 | Growing | Aging population needs hospitals, clinics and senior care |
| Amusement and recreation | +3.0 | Growing | Arenas, stadiums and performance venues |
| Retail | +2.7 | Modest growth | Mixed-use retail tied to multifamily projects |
| Warehouses | +1.4 | Stabilizing | E-commerce buildout has cooled |
| Education | +0.9 | Flat | Slow population growth outside the Sunbelt |
| Manufacturing | -0.6 | Declining | CHIPS Act and IRA project wave is fading |
| Traditional offices | -4.5 | Declining | High vacancies from remote and hybrid work |
Source: AIA July 2026 Consensus Construction Forecast.
Data centers: the top of the K
Data centers stand alone at the top of the market. AIA expects data center spending to jump 33% in 2026 and another 25% in 2027, reaching about 8% of all nonresidential building spending. Commercial spending overall is forecast to rise 5.8% in 2027, but without data centers that figure drops to roughly 1%.
For contractors, the opportunity is real but concentrated. ABC reports that only about 12% of contractors are under contract on data center work, and most of them have more than $100 million in annual revenue. Smaller firms can still win electrical, mechanical, site work and specialty packages as subcontractors.
Residential construction
Housing remains stuck between a shortage of homes and buyers who cannot afford them. The National Association of Home Builders (NAHB) says 2026 will be the second straight year of single-family decline, and signs point to further declines in 2027. The 30-year mortgage rate averaged 7.03% in late September 2026, its highest level since January 2025.
Multifamily starts are forecast to fall about 6% in 2027 to a 367,000-unit pace, according to NAHB’s February 2026 outlook. Remodeling is the bright spot, with NAHB projecting a 2% gain in 2027 as owners invest in older homes and aging-in-place upgrades.
Infrastructure and public works
Public infrastructure has been a steady source of work since 2021, but 2027 brings funding questions (covered below). ABC’s infrastructure backlog fell to 8.7 months in October 2026, its lowest level since May 2025. Contractors in heavy civil work should watch Congress closely before committing to new equipment or hires.
How bad will the construction labor shortage be in 2027?
The labor shortage is expected to get worse in 2027, not better. ABC estimates the industry must attract about 456,000 net new workers in 2027, up from 349,000 in 2026, as spending growth resumes. More than half of the 2026 need comes from replacing retirees rather than from new demand.
Several pressures are stacking up at once:
- Retirements: An aging workforce means experienced superintendents, foremen and tradespeople are leaving faster than new workers arrive.
- Immigration enforcement: ABC calls immigration policy a wildcard for labor supply, and AIA notes lower immigration is already tightening the workforce.
- Data center demand: Megaprojects are absorbing electricians, pipefitters and mechanical trades, which pulls talent away from smaller jobs.
- Wage pressure: In the AGC and NCCER 2025 Workforce Survey, 92% of firms that were hiring reported trouble finding qualified workers.
What this means for contractors
Expect labor to remain the biggest limit on how much work you can take on in 2027. Firms that invest in apprenticeships, retention and productivity tools will be able to bid more work with the same crew size. Firms that do not may have to turn down profitable jobs or absorb overtime costs that erase their margins.
Will construction material costs keep rising in 2027?
Material costs enter 2027 at their fastest pace of growth in four years. Input prices for new nonresidential construction rose 11.9% from September 2025 to September 2026, according to an Associated General Contractors of America (AGC) analysis of federal producer price data. Tariffs of up to 50% on metals and the oil price spike tied to the Iran conflict are the two biggest drivers.
| Input | Price change, Sept. 2025 to Sept. 2026 (%) |
|---|---|
| Diesel fuel | +115.2 |
| Copper and brass mill shapes | +30.0 |
| Steel mill products | +27.6 |
| Aluminum mill shapes | +25.2 |
| Truck freight transportation | +19.3 |
| Liquid asphalt | +17.7 |
Source: AGC analysis of Bureau of Labor Statistics producer price index data.
Supply chain and lead times
Price is only half the problem. AGC reports that steel beam producers have order books full through spring 2027, and some contractors have been told they will receive only a fraction of the beams they ordered. Longer lead times make schedule guarantees riskier on any steel-framed project.
Can contractors pass costs on?
Not easily. AGC says most firms are absorbing the increases because demand outside data centers is too soft to support higher bids. ABC found that roughly 1 in 4 contractors expect profit margins to shrink over the next six months. AIA also notes that oil price spikes tend to show up in material prices about three months later, so some 2026 increases will still be flowing into 2027 bids.
How will interest rates and federal funding affect construction in 2027?
Contractors should plan for higher-for-longer interest rates and uncertain federal infrastructure dollars in 2027. Both affect whether owners can finance projects and whether public agencies can keep letting contracts.
Interest rates
The Federal Reserve raised its benchmark rate by a quarter point in September 2026, its first increase since 2023. At its October 28, 2026 meeting, the Fed held the federal funds rate at 3.75% to 4%, with two members voting for another increase. The Fed said inflation “remains elevated.”
For construction, higher rates mean:
- Tighter project financing: Developers face higher borrowing costs, so marginal projects get delayed or shelved.
- Weaker housing demand: NAHB notes that mortgage rates above 7% are sidelining buyers, which slows residential starts.
- Higher carrying costs for contractors: Equipment loans and lines of credit cost more, which squeezes cash flow on slow-paying jobs.
AIA’s panel notes that interest-rate-sensitive sectors such as offices, warehouses and speculative commercial projects will struggle the most.
Federal infrastructure funding
The Infrastructure Investment and Jobs Act (IIJA) authorized highway, transit and rail programs through September 30, 2026. Congress has extended those authorizations only through December 11, 2026, while it negotiates a replacement, according to the Congressional Research Service. The IIJA’s multiyear advance appropriations also ended with fiscal year 2026.
The leading House proposal, the BUILD America 250 Act (H.R. 8870), would provide about $73 billion for federal highway programs in fiscal year 2027. It would also end some IIJA programs, including the Carbon Reduction Program and the dedicated EV charging formula program. Meanwhile, the Highway Trust Fund’s highway account is projected to run dry around fiscal year 2028 without new revenue.
What this means for contractors: state DOTs may slow new lettings until they know their federal funding. Heavy civil and highway contractors should track their state’s lettings schedule closely and avoid overcommitting crews or equipment on the assumption that IIJA-level funding will continue unchanged.
What construction technology trends matter in 2027?
Technology adoption is shifting from experiment to necessity as labor gets scarcer and margins get thinner. AI is moving fastest. In a 2026 industry survey of more than 1,000 commercial specialty contractors, 38% reported measurable business results from AI, up from 17% a year earlier. On the design side, AIA reports that nearly half of architecture firms are now actively working with AI.
The technologies most likely to pay off for contractors in 2027 include:
- AI-assisted estimating and takeoffs: Faster bids help firms respond to more opportunities without adding estimators.
- Scheduling and forecasting tools: Better visibility into lead times helps manage long steel and equipment deliveries.
- Field documentation and reporting: Mobile apps and photo capture cut paperwork for superintendents and reduce disputes.
- Prefabrication and modular construction: Building components off site reduces the number of skilled workers needed in the field.
- Equipment telematics: Tracking fuel use and idle time matters more when diesel prices have doubled.
The main barriers are training and integration. Many contractors run several disconnected software systems, which makes it harder to get value from AI. Start with tools that solve one clear problem, such as estimating speed or daily reporting, and build from there.
How should contractors prepare for 2027? A 10-step checklist
The best way to prepare for 2027 is to diversify your pipeline, protect your margins from price swings and lock in your workforce early. Use this checklist to plan your next 12 months.
- Review your market mix. Compare your backlog against the growing sectors (data centers, health care, hotels, public institutional work) and the shrinking ones (traditional offices, manufacturing). Shift business development toward the growth side.
- Pursue data center work as a subcontractor. If you cannot bid as a prime, target electrical, mechanical, site work, concrete or specialty packages with the general contractors who are winning these projects.
- Add escalation clauses to contracts. With input prices up nearly 12% in a year, include material price escalation language and shorten how long your bid prices stay valid.
- Lock in long-lead materials early. Order steel, switchgear and other long-lead items as soon as a project is secured, and confirm supplier allocations in writing.
- Stress-test your cash flow. Model what happens if rates rise again or a large owner pays late. Review your credit lines and bonding capacity before you need them.
- Invest in retention. Replacing an experienced worker costs far more than keeping one. Review pay, benefits, training paths and safety culture now.
- Build your own talent pipeline. Partner with trade schools, apprenticeship programs and local high schools to grow the workers you will need in 2027 and 2028.
- Pick one technology upgrade. Choose a tool that solves a clear bottleneck, such as estimating, scheduling or field reporting, and roll it out fully before adding another.
- Track federal and state funding. If you do public work, watch the surface transportation reauthorization and your state DOT’s lettings schedule before buying equipment or hiring for highway work.
- Bid selectively. In a soft market, it is tempting to chase every job. Protect your margins by walking away from projects with unclear scope, risky owners or unrealistic schedules.
Frequently asked questions about the 2027 construction outlook
Will construction be good in 2027?
Construction is expected to improve modestly in 2027, but not evenly. The AIA Consensus Construction Forecast projects a 3.0% rise in nonresidential building spending, driven mostly by data centers, health care and public projects. Offices, manufacturing and most housing segments are expected to stay weak.
What is the fastest-growing construction sector in 2027?
Data centers are the fastest-growing sector by a wide margin. AIA forecasts data center spending will rise 25% in 2027 after a 33% gain in 2026. By 2027, data centers are expected to make up about 8% of all nonresidential building spending.
How many construction workers will be needed in 2027?
Associated Builders and Contractors estimates the industry will need about 456,000 net new workers in 2027. That is up from an estimated 349,000 in 2026, as retirements continue and spending growth picks up.
Will construction material prices go down in 2027?
A broad drop in material prices is unlikely in early 2027. Input prices rose 11.9% in the year through September 2026, driven by tariffs on metals and higher fuel costs. Some energy-related prices could ease if oil stays lower, but steel supply is tight through at least spring 2027.
What happens to infrastructure funding when the IIJA expires?
The IIJA’s surface transportation programs expired September 30, 2026, and Congress extended them through December 11, 2026. If Congress does not pass a new multiyear bill or another extension, states could face funding gaps that delay new highway, bridge and transit lettings.
Are interest rates going down for construction in 2027?
Not necessarily. The Federal Reserve raised rates in September 2026 and held them at 3.75% to 4% in October, citing elevated inflation. Contractors and developers should plan for financing costs to stay high, and possibly rise, through at least the first half of 2027.
What should small contractors focus on in 2027?
Small contractors should focus on protecting cash flow, keeping skilled workers and targeting steady markets like health care, education renovations, remodeling and subcontract work on large data center projects. Escalation clauses and selective bidding will help protect margins.
The bottom line for contractor and the construction spending forecast
2027 will be a year of modest growth for the industry as a whole and real opportunity for contractors who position themselves well. The firms that do best will follow the money into data centers, health care and public work, build escalation protection into every contract, and treat their skilled workers as their most valuable asset. Start planning now, because the decisions you make in the next few months will shape your backlog, your margins and your crews for all of 2027.